New Features in Oracle projects in R12.2
Search Cost Breakdown
Structure page
|
This page enables you
to search for cost breakdown structures
and also create cost breakdown structure.
|
Create Cost Breakdown
Structure
|
This page enables you
to specify header, level and hierarchy
details for a Cost
Breakdown Structure.
|
Create/Update Header
|
This page enables you
to update the header or level details
of the cost breakdown
structure.
|
Create/Update
Hierarchy
|
This page enables you
to update the hierarchy of the cost
breakdown structure.
|
A new option Enable Cost Based Structure has been added in the Project Setup page to enable project for cost based planning. This checkbox is enabled if the new profile option PA: Enable Projects for Cost Breakdown Planning is set to Yes.
Added a new LOV to select the cost breakdown structure for a project if the above check box is selected.
New two tables is introduced in R12.2
PA_CBS_HIERARCHY | Stores the hierarchy of the levels defined for the cost breakdown structure. |
PA_ALTERNATE_TASKS | Stores the alternate task ID information of the eligible cost codes for a project. The alternate task is the task ID plus the cost code in a cost breakdown enabled project. |