Total Pageviews

November 28, 2015

11/28/2015 12:39:00 PM
31. A resource whose capacity can be shared with other departments is called as
    
 a  Multi Department Resource      b. Department Resource      c. Either A or B         d. none of the above

 32.  The time required to receive a purchased item into inventory from the initial supplier receipt, such as the time required to deliver an order from the receiving dock to its final destination is called as
  
  a. post processing lead time     b. pre processing lead time     c. Either A or B        d. none of the above

33. The time required to place a purchase order or create a discrete job or repetitive schedule is called as
  
  a. post processing lead time     b. pre processing lead time     c. Either A or B        d. none of the above

34. The time required to procure or manufacture an item is called as
     a. post processing lead time     b. processing lead time     c. Either A or B        d. none of the above

35. An optional identifier you can assign to a component on a bill is called as       

a. Reference Designator     b. Substitute Item     c. Either A or B        d. none of the above

36. Anything of value, except material and cash, required to manufacture, cost, and schedule products is called as

    a. Resource    b. Resource Basis    c. Either A or B       d. none of the above

37. A scheduled period of work for a department within an organization is called as

    a. Shift    b. Shift Units    c. Either A or B       d. none of the above

38. A group of capacity modifications for resource shifts to simulate, plan, or schedule Capacity is called as

    a. Simulation Set    b. Simulation schedule    c. Either A or B       d. none of the above

39. A calendar that identifies available workdays for one or more organizations is called as 

    a. Workday Calendar    b. Inventory Calendar    c. Either A or B       d. none of the above

40. Dates that define plant or shift workday variations, including holidays, scheduled maintenance, or extended downtime is called as

    a. Workday Exceptions    b Workday Exceptions Set    c. Either A or B       d. none of the above

41. The amount of a resource consumed at an operation is called as

    a. Usage Rate    b Standard Rate    c. Either A or B       d. none of the above

42. The frozen standard unit cost for a resource is called as

    a. Usage Rate    b Standard Rate    c. Either A or B       d. none of the above

43. Subdivision of an organization, representing either a physical area or a logical Grouping of items, such as a storeroom or receiving dock is called as

      a Department      b. Sub inventory      c. Either A or B         d. none of the above

44. A carrier’s contract and receipt of goods transported from one location to another is called as

      a  Bill of Lading      b. Freight Carrier       c. Either A or B         d. none of the above

45. An action on an order signifying that the order has all the necessary information to      be a firm order and be processed through its order cycle is called as

      a Booking      b. Entered       c. Either A or B         d. none of the above
 
Related Posts Plugin for WordPress, Blogger...